Jump to content

Recommended Posts

Guest TomKin
Posted

W e have built an extension to our house, which includes a garage with a bedroom above. We have lined the walls and ceiling with two overlapping layers of 12.5mm plasterboard. Are we required to have a plaster skim applied over the plasterboards, in oder to obtail Building Regulations final approval?

(Please note, we have already had the relevant electrical work certified by the qualified electrician, who installed it.)

Posted

Check out Approved document B (Fire Safety) Vol 1 my understanding is it requires 30mins FR between an attached garage and the house. Two overlapping layers of 12.5mm plasterboard skimmed will give you 60mins, one layer skimmed would give you 30mins. I would suggest you contact your building control officer as you appear to be between two stools.

Check out http://fire.org.uk/forum/index.php?topic=5055.0 for more info.

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...